The following projects were submitted to Engineers Australia. The purpose was to demonstrate my competency as an Electrical Engineer, at a professional engineering level. The Competency Demonstration Reports are combination of my academic projects and work experience (internships). I was recognised as a Professional Electrical Engineer Level 1 by the institute of Engineers Australia based on my work experiences and University Projects.
Projects

Electrical Engineer Intern 12th Oct. 2013 – 25th Apr. 2014
Ankhu Khola Jalbidhyut Company LTD.
Naxal-1, Kathmandu Nepal
Core Responsibilities:
-
Operation of 8.4MW Power Plant.
-
Generating Hydro Power of 8.4MW and Transmitting (33KV) to Grid.
-
Repair and Maintenance of Power Plant, 4 Substations under the Powerhouse and 33KV Transmission line.
-
Improvement of Plant Capacity factor by working on team to define the operation strategies.
-
Controlling and monitoring of Power Plant using Supervisory Control and Data Acquisition (SCADA).
-
Cost calculation of total Power (Megawatts) per months transmitted to Grid.
-
Troubleshooting of LV (415V, 6.6KV) and MV (33KV) Panels.
-
Manage team to complete internal projects such as Evacuation Pump overhauling, Cooling system overhauling, Turbine Overhauling.
-
Reporting and Documentation.
Additional Responsibilities:
-
Team (technicians) management role, to ensure completion of internal projects
-
Attending and participating in team meetings
-
Ensuring compliance with National, Organisational and Engineering standard operating procedures, policies and best practices
-
Reporting & Documentation
Hierarchy


Network Technical Specialist 28th Nov. 2017 – 15th Feb. 2018
(Level 1 & 2/ Internship)
Westcon-Comstor Australia
Unit 4, 39 Herbert Street St. Leonard NSW 2065 AUSTRALIA
Core Responsibilities:
-
To perform Level 1, 2, and 3 operations on Cisco Networking Devices (Routers, Switches, Access Points etc.)
-
To manage the day to day flow of orders through the Integration Centre.
-
Oversee the staging of hardware from manufacturers in the Westcon-Comstor vendor portfolio (Mainly Cisco Systems).
-
Ensure all kit builds are completed as per the specified order.
-
Creating and updating of Technical documents (project diagrams, configurations, and guides).
-
Work with the Services to manage the staging of projects.
-
To maintain understanding of Westcon-Comstor technical offerings.
-
Keep records of customer interactions and transactions, recording details of inquiries, complaints, and comments, as well as actions taken.
-
Continual updating of technical skills.
-
Workplace continuous improvement: tools, facilities, software, and process.
Secondary Responsibilities:
-
To configure hardware from manufacturers in the Westcon-Comstor vendor portfolio.
-
To install hardware and software/IOS into all vendors’ kit. (CISCO Networking Devices).
-
Ensure all kit builds are completed as per the specified order.
-
Install and perform minor repairs to hardware, software, and peripheral equipment, following design or installation specifications.
-
Read technical manuals, confer with users, and conduct computer diagnostics to investigate and resolve problems.
-
To proactively follow up on customer order inquiries.
-
Create and modify SharePoint Logistics page as required (RMA, refurb and calendar lists).

Integration of Renewable Energy Power Generation with Voltage Source Converter (VSC) Inverter Connected Load.
Objectives:
Project aims and objectives included,
-
Renewable Energy power generation
-
Design & Development of VSC which has grid integration capabilities
-
Implementation of the black-start capability of VSC
-
Practical testing and implementation of VSC for energy conversion to AC power for 50/60Hz frequency
-
Reduction of harmonics
Tasks :
-
Literature review of different converters (Each member focused on one type. My focus area was buck-boost and Cuk converters)
-
In-depth study of VSC – Topologies, Design and mathematical modelling
-
Study of Black-start VSC
-
Responsible for providing the technical requirements for a Black-start service
-
Running simulations for RL load (Team members worked on Resistive load)
-
Design of the logic circuit
-
Provide help with the switching & SMPS circuits to team members
-
Hardware implementation and integration of all circuit modules
-
Running final tests and recording results
-
Managerial Duties:
I had the following project management related duties,
-
Creating the initial project plan
-
Develop the work breakdown structure and schedule tasks & activities
-
Task delegation
-
Monitoring project progress
-
Team management such as conflict resolution
VSC Design
System Model
Implementation
Results & Outcome





Grid Integration of Renewable Energy Using Pulse Width Modulation (PMW) Inverter
Objectives:
This project was a somewhat extension to the VSC converter project. Previously, we converted the variable DC from the renewable source into fixed DC. Here, we had to implement the 3-phase PWM inverter in association with IGBT, to get a AC power and then integrate it to the grid via a synchronizer. Salient points of include,
-
Implementation of the PWM inverter
-
To have grid integration capabilities
-
Inclusion of microcontroller for IGBTs conduction
-
Determining circuit’s zero crossing
-
Synchronization of the AC output power with the grid
-
Final grid integration & testing
Tasks :
-
Background knowledge & Literature Review
-
Running MATLAB simulations for Buck-Boost & Cuk Converter
-
MATLAB Simulations for Full bridge VSI
-
Sinusoidal PWM inverter design, mathematical modelling & simulations
-
Circuit design & implementation of SPWM inverter, driver IC and Pulse amplification unit
-
Collaborating with hardware implementation of the project
-
Final integration & testing
Managerial Duties:
I had the following project management related duties,
-
Creating the initial project plan
-
Develop the work breakdown structure and schedule tasks & activities
-
Task delegation
-
Monitoring project progress
-
Team management such as conflict resolution
Circuit Design
Hardware Results
Results & Outcome

Testimonials
“Comprehensive, theory-based understanding of the underpinning natural and physical sciences and the engineering fundamentals applicable to the engineering discipline.”
Afsar Ali SHAIKH, Electrical Engineer
Testimonials
“Application of established engineering methods to complex engineering problem solving.”
Afsar Ali SHAIKH, Electrical Engineer